标题(Title) 一般不超过80个字符
Vertical Wick Drain, Vacuum Preloading, PVD Mast, Tower Crane, Geotextile – Guangdong HLS Civl Engineering Foundation C...
(122 个字符)
关键词(KeyWords)一般不超过100个字符
Vertical Wick Drain, Vacuum Preloading, PVD Mast, Tower Crane, Geotextile
(73 个字符)
描述(Description)一般不超过200个字符
HLS Engineering the Ground Improvement Solution Provider. WE are contributed to provide Design, Construction, Machinery and Material to reinforce the soil. Soil Foundation Design, Vertical Wick Drain Manufacturing, Installation and Tower Crane Manufacturing. Strong Water Drainage Soil Consolidation Method will be the leader of the Worldwide Ground Improvement Company, which is the innovation method from the Surcharge Pre-loading Method and Vacuum Pre-loading Method.
(470 个字符)